Art Iron — Design Assist Project

Mercy Hospital of Tiffin

Tiffin, Ohio

Art Iron worked with The Lathrop Company and Martel Associates Healthcare Architecture, Inc. with design / assist and construction of this 3 story, 190,000 square foot hospital. Using the design assist delivery method enabled the structural project team to compress the steel schedule for the project

  • Construction Manager – The Lathrop Company
  • Architect – Martel Associates
  • Engineer of Record – Ruby & Associates
  • Steel Fabricator / Erector – Art Iron / Henry Gurtzweiler, Inc.