Art Iron — Design Assist Project

Westfield Franklin Park Shopping Mall

Toledo, Ohio

Westfield Design & Construction created the initial architectural concept drawings for the 365,000 square foot facility in 2003. Construction began in February 2004. Just eight months later, in October 2004, erection of the main steel framing was completed.

In February 2004 Art Iron was awarded a contract to be a part of the design and construction team. Westfield Design & Construction and Art Iron used their collective knowledge to solve complex construction issues before costly design changes were required.

  • Construction Manager – Westfield Design & Construction
  • Architect – Westfield Design & Construction
  • Engineer of Record – Westfield Design & Construction
  • Steel Fabricator / Erector Art Iron, Inc. / Henry Gurtzweiler, Inc.